What is recorded
A background job looks at every source on a schedule and compares what it sees to what it last saw. When the two differ, it writes one entry:
Two of those need a word.
Changed is when the change was seen, not when it happened — a schedule
cannot see a thing at the instant it becomes true. Last seen before is the
look that came immediately before it, so the change happened somewhere between
the two. On a normally running schedule that window is minutes. If the job had
been stopped for a day, the window says so rather than pretending to a precision
it does not have.
Connected and silence means something after are copied onto every entry
rather than looked up on the source. They are the two dates that separate a
source that never started from one that stopped, and that distinction has to
survive the source moving on to something else.
Reading it
Each source on the Sources screen carries its own history, newest first. Every change is kept. A source that goes quiet on a Tuesday and starts delivering again on the Friday leaves both entries behind, not just the later one — the history is a list of what happened, not a note of where things currently stand.Recording that you noticed
Beside each entry there is one thing you can add: that you saw it, and when. That is the other end of an interval nobody else can supply. The product knows when a source went quiet. Only you know when a person found out, and the gap between the two is the only measure of whether this screen is doing its job. Two things about the record:- The moment you noticed does not move. Once an entry is marked as noticed, a second visit does not overwrite the time. A time that could be rewritten later would make the gap unreadable.
- What it turned out to be can be filled in afterwards, because on the day you notice you usually do not know yet. You can come back and say whether the source was genuinely broken, and whether you contacted the team on the other end about it.